    1. Design Life & Maintenance Interval


    Description    Design Life Maintenance Interval
    25 years
    25 years
    Paint for the passages/hot dip galvanized coating for the racks
    25 years
    15 years
    50 years
    50 years


    Steel_Reefer_Racks_and_Reefer_Safety_Tunnels _For_APM_Terminal_Maasvlakte II_1_Installation

    (Reefer Tunnels and Reefer Passages between stacks and reefer racks)


    2. Guarantees


    Element/Product
    Minimum Guarantee Period
    Reefer frames (structure and fittings)
    5 years

    3. Design Criteria Tables

    Reefer Rack Type
    Container type
    Container
    handling
    equipment
    Rows
    Tiers
    Single or
    Double
    Sided

    [A1]
    9’6
    ARMG
    9     5 Single
    [A1]
    8’6
    ARMG
    9 3 Single

    4. Reefer Rack Geometry and Requirements

    Parameter

    [A1]
    9’6 9x5

    [A2]
    8’6 9x3

    Single / Double Sided
     Single    Single
    Overall steel frame length (mm)

    24480 24480
    Overall steel frame width (mm)
    1700 1700
    Floor height, FFL to FFL per floor (mm)
    2900 2600
    Ground level floor height, FFL to FFL (mm)
    2900 2600
    Number of reefer plugs
    One per container plus one
    spare per level
    One per container plus one
    spare per level
    Location of reefer plugs
    One side only, 1000-1400
    above FLL
    One side only, 1000-1400
    above FLL
    Maximum permissible steel frame height (mm)
    14480 Not applicable (N/A)
    Clearance from steel frame to containers, plug side (mm)
    400 400
    Clearance from steel frame to containers, non-plug side (mm)
    600 nominal
    600 nominal
    Clear distance between containers (mm)
    350 350
    Clearance from end of steel frame to end of last container (mm)
    150(shorter) 150(shorter)
    Minimum clear width of stairs (mm)
    700 700
    Transverse position of stairs
    Non-plug side
    Non-plug side
    Minimum clear width of platform at any location (mm)
    700 700
    Provision for pavement slope
    1% ± 0.5%
    1% ± 0.5%
    Roof required on top level
    Yes
    Yes
    Bollards required at each corner
    Not applicable (N/A)
    Not applicable (N/A)
    Paint colour
    Not required (galvanized only)
    Not required (galvanized only)




    LAYOUT_AND_DIMENSIONS_OF_REEFER_RACKS_AND_PASSENGER_TUNNELS_1_Layout-3D-isometric

    (Reefer Tunnels and Reefer Passages between stacks and reefer racks 3D Isometric View)


    5. Reefer Rack Design Loads


    Parameter
    Value
    Dead Load
    Self-weight of the structure

    Superimposed Dead Load

    Self-weight of electrical equipment, including distribution boards,
    cable trays and cabling, etc.

    Live Load – Flooring

    UDL: 1000 kg load over any 4 m2 , i.e. any sector of 4 m2 shall be
    able to withstand 250 kg/m2 , and the whole platform will not be
    loaded with more than 1000 kg total.
    Point load: All surfaces and steps shall resist 450 kg point load
    over an area of 200 x 200 mm at any point, with deflection not
    greater than 10 mm during application and with no permanent

    deformation



    60kg vertical load in the most unfavourable location and 75kg
    horizontal load in the most unfavourable location (loads not
    applied simultaneously)


    Live Load – Handrails and
    Parapets

    deflection not greater than 15 mm during application and with no
    permanent deformation

    Operational Wind Speed

    Refer Part A “General Project Considerations

    Storm Wind Speed

    Refer 01 Part A “General Project Considerations

    Seismic Load

    Importance Factor: 1.0
    Refer Part A “General Project Considerations” for other parameters

    6. Reefer Passage Requirements

    Parameter 
    Value
    Superimposed Dead Load
    Weight of up to 4 No. fully laden containers (up to 35 t each)
    placed on top via corner castings
    (1st container will be 35 t buffer container filled with sand + 3 fully
    loaded containers on top)
    Dynamic Load
    Weight of 1 fully laden container (35 t) to be considered with a
    minimum factor of safety of 2.0 (in addition to the superimposed
    dead load).
    Alternative methods to allow for the dynamic load from container
    placement may be considered in accordance with adopted codes,
    subject to approval by the Engineer.
    Live Load – Flooring
    2.0 kPa
    Operational Wind Speed
    Refer Table 5 as above listed
    Storm Wind Speed
    Refer Table 5 as above listed
    Seismic Load
    Refer Table 5 as above listed
    Container Impact Load
    Minimum 50 kN (from a fully laden container) to be applied to the
    structure as a point load at various locations and in various
    directions to suit the container handling equipment. These point
    loads shall not be applied simultaneously.
    The structure may be damaged by this impact but the damage
    shall be repairable with the replacement of the impacted elements
    but the structure shall not collapse under the impact of the
    loading.
    This load case shall not be considered in combination with other
    loads (except dead loads)



    Note: Structural reinforcement shall be provided at each end of each passage, to resist the loads listed above in Table 6. As a minimum, each vertical column shall have at least the same structural capacity as the unmodified container corner posts, the horizontal beams shall have at least the same structural capacity as the unmodified container beams, and diagonal bracing shall be provided in the top corners for torsional restraint.


    7. Reefer Rack Foundation Requirements


    Parameter
    Value
    level projection above
    surrounding ground level
    • Arid / low rainfall environment: Flush with surrounding
    pavement
    • Heavy / frequent rainfall environment: 200mm above
    surrounding pavement
    • For converted containers: Flush with surrounding pavement
    • Raised floor to prevent water or frozen puddles.
    • Reduced steps as much as possible.
    • The level of the foundation is flush with ground level for the
    stacks that are being prepared only. Other foundation levels
    to be included in overal height first (ground) level of the
    racks.
    Design Loads
    • Loads to be defined by reefer rack designer, including but not
    limited to:
    o Maximum vertical compression at the base of each column
    o Maximum vertical uplift at the base of each column
    o Maximum horizontal shear at the base of each column
    o Maximum bending moment at the base of each column
    o Overturning effect (bending moment) on the base slab
    from each pair of columns
    • Live load on ground level = 2.0 kPa
    • Dead load of any electrical equipment to be considered, where
    relevant
    Holding Down Bolts
    Bolt arrangement, size and embedment length at each column to be defined by reefer rack designer



    LAYOUT_AND_DIMENSIONS_OF_REEFER_RACKS_AND_PASSENGER_TUNNELS_2_Layout-passener_tunnel_and_sub-station


    (Reefer Tunnels and Reefer Passages between stacks and reefer racks and substation)

    Would you like to see more information and images of ZHM’s Metal Steel Structure Reefer Racks ? Visit our Photo Gallery.

    HOW CAN WE HELP YOU?

    ZHM’s world-class team — together with our raw material suppliers and subcontractors — works to solve your most challenging design, engineering, farbrication or construction issues.

    Contact ZHM by telephone at +86 135-8815-1981 (wechat and whatsapp) or send us your questions via email to info@zhmsteelworks.com